Skip to content
BlurtekBlurtek
← Back to blog
AI & Automation

Connecting AI to your ERP: permissions, approvals and traceability before automation

Build useful AI agents for operations: start with limited read access, define approval rules and verify actions before expanding their autonomy.

Blurtek
3 min read456 words
Connected warehouse with transport robots: a conceptual visualisation
Conceptual technology image.
01

Start with a specific decision

Connecting AI to an ERP should not start by granting access to the entire business. Choose a small, frequent decision: preparing a summary of pending orders, explaining an inventory discrepancy or proposing the next step for an incident. Define the information required, who reviews the answer and what makes the pilot useful. The tool should fit a process that the team can already explain.

02

Distinguish reading, proposing and executing

These capabilities need different permissions. Reading an order does not imply permission to change its address; drafting a proposal does not imply permission to send it to a customer. In a hypothetical distribution scenario, an assistant could prepare a delay list for human review while dispatch remains under the operations team. This separation lets you assess quality without turning every model response into an irreversible action.

03

Documents provide information, not access instructions

An agent may encounter malicious instructions inside an email, webpage or retrieved document. This is the indirect prompt-injection problem. Retrieved content must not be able to expand permissions or independently decide where data is sent. Keep permitted tools and authorisation rules outside the model’s decision-making and review sensitive actions before execution.

04

Turn approvals into understandable rules

Specify which changes require a person and what they will see before approving: affected record, previous value, proposed value and reason. A proposal that changes after approval needs another review. Define expiration and what happens if the ERP stops responding. A timeout does not necessarily mean an operation was not executed; the connector should check its status before retrying.

05

Traceability should help resolve incidents

Connect the business request to the workflow version, sources used, approval and integration result. Avoid logging secrets or complete documents by default. A useful operations screen answers practical questions: what is pending, who can resolve it and whether a safe compensating action exists. Large log volumes do not provide that clarity if systems lack shared correlation identifiers.

06

A pilot with clear exit criteria

Prepare representative examples, including incomplete data and requests that must be refused. Check whether the assistant distinguishes known answers from assumptions and preserves user permissions. Investigate repeated errors before adding more tools. Blurtek can help define integration scope, local or hybrid deployment and operational controls. The choice depends on your systems, data and the decisions you want to automate.

07

A starting checklist

  • Defined use case and accountable owner.
  • Read access separated from write and send access.
  • Approval bound to a specific proposal.
  • Retries that avoid duplicate operations.
  • Useful minimal logging and a stop procedure.

Define the scope and next step with the Blurtek team.

Explore the service
WE START BY LISTENING

Your next step,
thought through together.

Tell us what needs to improve. We help you decide where to start and what is worth building.

Tell us about your project